![]() The offshore Dalma field is located 190 kilometers northwest of the Emirate of Abu Dhabi. This will in turn contribute further to the development of local resources as well as human capacity and talent.”īoth engineering contracts are expected to be completed in 2025 and will enable the Dalma field to produce around 340 million standard cubic feet per day (mmscfd) of natural gas. It’s reiterates the confidence of ADNOC in NPCC in delivering mega projects that will contribute to enhancing gas production to achieve self-sufficiency in Abu Dhabi and the UAE, at NPCC we are committed to ADNOC’s development projects, especially in achieving highest In-Country Value (ICV). Ahmed Al Dhaheri, CEO of NPCC, added: “Being awarded for the Dalma Gas Development Project is a testament to NPCC’s continued growth in oil and growths sector in the UAE. Together, we are responsibly progressing the Ghasha mega development to maximise value as well as support the gas self sufficiency goal of the UAE.”Įng. “ADNOC and its partners remain guided by our strategic production capacity objectives and sustainability ambitions. As we continue to execute this strategic project, we are ensuring it delivers substantial In-Country Value to drive economic growth and support the objectives of the UAE’s Principles of the 50, set out by the country’s wise Leadership. ![]() Yaser Saeed Almazrouei, ADNOC Upstream Executive Director, said: “The award of the Dalma EPC contracts as well as ongoing artificial island construction and development drilling underscore the progress of the Ghasha mega development. Package B, awarded to the Técnicas Reunidas and Target Engineering JV, is valued at $950 million (AED3.49 billion) and covers the EPC of gas conditioning facilities for gas dehydration, compression and associated utilities on Arzanah Island located 80 kilometers from Abu Dhabi. It covers the EPC of four offshore wellhead towers, pipelines and umbilicals in Hair Dalma, Satah, and Bu Haseer fields. Package A of the two Dalma EPC contracts was awarded to NPCC and is valued at $514 million (AED1.89 billion). Seventy percent of the award value will flow back into the UAE’s economy under ADNOC’s successful In-Country Value (ICV) program, reinforcing ADNOC’s commitment to ensuring more economic value remains in the country from the contracts it awards. The two EPC contracts, awarded to National Petroleum Construction Company (NPCC) and a joint venture (JV) between Técnicas Reunidas and Target Engineering, include the construction of gas conditioning facilities, wellhead topsides, pipelines and umbilicals. The Dalma field is part of the Ghasha Concession which is the world’s largest offshore sour gas development and an important enabler of gas self-sufficiency for the United Arab Emirates (UAE). The Abu Dhabi National Oil Company (ADNOC) announced today, the award of two engineering, procurement and construction (EPC) contracts totaling $1.46 billion (AED5.36 billion) for the Dalma Gas Development Project. ![]() ADNOC Awards $1.46 Billion EPC Contracts for the Dalma Gas Development Project
0 Comments
Leave a Reply. |